Our expert plumbing team from Geelong recently upgraded critical fire protection systems for a local client, improving site safety and emergency response capabilities.
Project Manager Max Kueter-Luks led the project while coordinating works within a busy, high-traffic operational environment.
The project focused on delivering reliable and compliant fire protection systems to support current and future firefighting requirements. To achieve this, our team installed a new Dominator diesel pump set alongside two 14,000-litre water storage tanks.
In addition, Kennedys Group completed targeted upgrades to the existing storage shed to support the new infrastructure. The team carefully integrated each component to create dependable and efficient fire protection systems across the site.
Every element of the installation prioritised long-term performance, compliance, and ease of future maintenance. Through detailed planning and strong coordination, the team successfully delivered the project within a compressed construction timeframe.
Because the site remained operational throughout construction, careful scheduling and communication became essential. Our crews adapted to changing site conditions while maintaining safety, productivity, and workflow continuity across the project.
The works also created valuable development opportunities for emerging team members working within a live construction environment. Under experienced supervision, they contributed meaningfully to the successful delivery of the project while gaining practical onsite experience.
This upgrade provides a practical and future-focused outcome for the client while strengthening overall site safety and emergency preparedness.
The project also reflects Kennedys Group’s ability to deliver complex fire protection systems with precision, professionalism, and strong operational coordination.