Replacing 3,000m² of roofing while businesses continue operating below takes careful planning, clear communication, and experienced delivery.
At a commercial facility in Breakwater, Geelong, Kennedys Group delivered a complete roof replacement. Project Manager Stephen Camilleri and Leading Hand Chris Walsh guided the project from start to finish. The team replaced the existing roof, installed 200 metres of new box guttering, and regraded the drainage system to improve water flow. They also installed new internal stormwater overflow points to provide compliant secondary drainage during heavy rainfall. These systems protect the building if primary outlets become blocked. The team reflashed and sealed every roof penetration, creating a durable, watertight finish. The new roof structure also provides a strong foundation for the facility’s existing solar panel system, supporting long-term renewable energy generation.
Keeping tenants operating throughout construction presented the project’s biggest challenge. Careful planning, clear communication, and staged works kept disruption to a minimum. Full perimeter scaffolding gave the team safe access across the building. Close collaboration with tenants and project stakeholders kept the programme on track while maintaining day-to-day operations.
The completed works have strengthened the entire building envelope. Improved drainage, renewed weatherproofing, and compliant overflow systems now provide greater protection against water ingress. The new roof also supports the facility’s existing solar installation, helping the client generate renewable energy for years to come. Together, these upgrades have extended the asset’s service life and reduced future maintenance requirements.
As a Head Contractor in Geelong, Kennedys Group delivers commercial roofing and plumbing solutions that protect critical assets and keep businesses operating. Every project reflects careful planning, practical thinking, and a commitment to quality that stands the test of time.





